国产bbaaaaa片,成年美女黄网站色视频免费,成年黄大片,а天堂中文最新一区二区三区,成人精品视频一区二区三区尤物

首頁> 外文期刊>KSCE journal of civil engineering >Artificial Ground Freezing In Tunnelling Through Aquifer Soil Layers: a Case Study in Nanjing Metro Line 2
【24h】

Artificial Ground Freezing In Tunnelling Through Aquifer Soil Layers: a Case Study in Nanjing Metro Line 2

機(jī)譯:穿越地下含水層的隧道中的人工地面凍結(jié):以南京地鐵2號線為例

獲取原文
獲取原文并翻譯 | 示例

摘要

In this paper, the construction of a section of Nanjing Metro Line 2, a shallow underground tunnel constructed with an underground mining method, was analysed. Due to the existence of two aquifer soil layers near the tunnel, water and sand inrush occurred during the tunnelling process. This disrupted tunnelling project was covered until the artificial ground freezing technique was used to achieve a waterless environment. After the 40-day active freezing period, the ground temperature conditions satisfied the design requirements, thereby ensuring the construction schedule. The ground freezing technique and other supplementary measurements were introduced in this study, which could be useful for other similar projects.
機(jī)譯:本文分析了南京地鐵2號線的一部分,這是一種采用地下采礦方法建造的淺地下隧道。由于在隧道附近存在兩個含水層,在隧道施工過程中發(fā)生了水和沙的涌入。這個被破壞的隧道工程一直被覆蓋,直到使用人造地面凍結(jié)技術(shù)來實現(xiàn)無水環(huán)境為止。經(jīng)過40天的主動凍結(jié)期后,地面溫度條件滿足了設(shè)計要求,從而確保了施工進(jìn)度。在這項研究中介紹了地面凍結(jié)技術(shù)和其他補(bǔ)充措施,這可能對其他類似項目很有用。

著錄項

相似文獻(xiàn)

  • 外文文獻(xiàn)
  • 中文文獻(xiàn)
  • 專利
獲取原文

客服郵箱:kefu@zhangqiaokeyan.com

京公網(wǎng)安備:11010802029741號 ICP備案號:京ICP備15016152號-6 六維聯(lián)合信息科技 (北京) 有限公司?版權(quán)所有
  • 客服微信

  • 服務(wù)號